Environmental Technologies Industries
|
Market Plans |
Colombia Environmental Export Market Plan |
Appendices |
Project Type | Description and Location | Organization | Contact |
Environmental Studies | |||
EIA | Bogotá mass transit system | Bogotá’s Mayor’s Office | Bogotá’s Mayor |
EIA | 34 irrigation districts | Instituto Nacional de Adecuación de Tierras (INAT) | Anwar Ojeda |
EIA | Various oil and gas projects | British Petroleum | Vinicio Cardenas |
EIA | Expanding Bogotá's drinking water supply system (Chingaza Project II) | Bogotá Water Utility | Diego Boada |
EIA | Dredging of the Dique Canal | CARDIQUE and CORMAGDALENA | Director of CORMAGDALENA |
Environmental Policy Design | Design of national environmental policies on water, air, solid waste, and hazardous wastes pollution control | Ministry of Environment | Fabio Arjona (Viceminister) |
EIA | Hydroelectric Project Guamuez | Promotora Guamuez S.A. | Maria del Rosario Guerra (Director of Fonade) |
Water Pollution Control | |||
Wastewater treatment plant | Tunjuelito sewage system (US$800 million) | Bogotá Mayor’s Office | E. Peñaloza |
Wastewater treatment plant | Fucha sewage system (US$700 million) | Bogotá Mayor’s Office | E. Peñaloza |
Wastewater treatment plant | Bogotá’s Juan Amarillo plant, Phase II | Bogotá Mayor’s Office | E. Peñaloza |
Wastewater treatment plant | Medellín (US$400 million); IDB funding. | Empresas Públicas de Medellín (EPM) | M. Valencia Cossio. (Director of EPM) |
Marine outfall | Cartagena | Aguas de Cartagena | Julio Gómez Piqueras (General Manager) |
Wastewaster treatment plant | Sogamoso | Sogamoso Mayor’s Office | |
Wastewater treatment plant | Bogotá Plain’s municipalities (Villapinzon, Facatativa, and Calera) | Corporación de Cundinamarca | Diego Bravo (Director) |
Water Supply Systems | |||
Aqueduct/ Sewerage expansion | Montería (also includes operation, maintenance, administration) | Mayor of Montería | |
Aqueduct/ Sewerage expansion | Barranquilla (also includes operation, maintenance, administration) | Triple A Water Utility | Director |
Aqueduct/ Sewerage expansion | Tunja (also includes operation, maintenance, administration) | Tunja Mayor’s Office | |
Aqueduct/ Sewerage expansion | Buenaventura (also includes operation, maintenance, administration) | Buenaventura Mayor’s Office | |
Aqueduct | Santa Marta (Rio Guachaca) | Santa Marta Mayor’s Office | |
Aqueduct/ Sewerage expansion | San Andres (also includes operation, maintenance, administration) | San Andres Governor’s Office | |
Air Pollution Control | |||
Energy Efficiency Program | IDB funding | Unidad de Planeamiento Minero Energético (UPME) | Arsenio Torres |
Air quality monitoring stations network | Bogotá | Departamento Administrativo de Medio Ambiente de Bogotá | Manuela Olivera |
Catalytic converters for vehicles | Ministry of Environment | Carlos Herrera (Director Sectorial Environment) | |
Sulfur oxide emission controls for refineries | Barrancabermeja and Cartagena | Ecopetrol | Vice President, Oil Refining, Ecopetrol |
Hydro-desulfurization of fuels | Barrancabermeja refinery | Ecopetrol | Vice President, Oil Refining, Ecopetrol |
Modernization of the alkylation plant | Barrancabermeja refinery | Ecopetrol | Vice President, Oil Refining, Ecopetrol |
Electrostatic filters for cement producers | Various locations | Cementos Boyaca. Cementos del Caribe, Cementos Diamante, Cementos del Nare, Cementos Caldas, Cementos Paz del Rio, Cementos Hercules, and Cementos del Valle | |
Electrostatic filters for steel mills and metalworking shops | Siderurgica de Medellín (SIMESA), Siderurgica del Pacifico (SIDELPA) in Cali, Siderurgica del Norte (SIDENOR) in Barranquilla, and Siderurgica del Muna (SIDEMUNA) near Bogotá, and Acerias Paz del Rio near Sogamoso | ||
Solid-Waste Management and Disposal | |||
Master Plan for Solid Waste Disposal in Bogotá | Bogotá; US$2 million. | Office of the Mayor | E. Peñaloza |
Landfill operation | Doña Juana Landfill (Bogotá); US$27 million. | Office of the Mayor | E. Peñaloza |
Landfill construction and operation | Mondonedo Landfill (Cundinarmarca) | Cundinarmarca CAR | Diego Bravo (Director of CAR) |
Landfill construction and operation | Various municipalities in the Bogotá Plains | Cundinarmarca CAR | Diego Bravo (Director of CAR) |
Landfill construction and operation | Cali; US$14 million | Office of the Mayor | Ricardo Cobo (Mayor) |
Landfill construction and operation | Barranquilla; US$14 million | Office of the Mayor | Bernardo Hoyos (Mayor) |
Hazardous-Waste Management and Treatment | |||
Groundwater pollution control | Complejo Industrial de Barrancabermeja (refinery) | Ecopetrol | J. Rizzo |
Groundwater pollution control | Refinería de Cartagena | Ecopetrol | J. Rizzo |
Oil spill control | Cano Limon Coveñas pipeline | Ecopetrol | Fernando Gutierrez (Vice President, Transportation) |
Environmental reference laboratory | National | IDEAM (Instituto de Estudios Ambientales y Metorologicos) | Pablo Leyva (Director) |
Environmental Management Systems and ISO 14000 | |||
Design and start environmental management system | National | Instituto Nacional de Vías (INVIAS) | Director of Environmental Affairs, INVIAS |
Design and start environmental management system | Pavco | Pavco’s President | |
Design and start environmental management system | Houston Oil Colombia (HOCOL) | Environmental Manager, HOCOL | |
Clean production center | Corporación Autónoma Regional del Río Nare (CORNARE) | Leonardo Muñoz (Director of CORNARE) | |
Environmental audit | Colmotores (Colombia’s General Motors) | ||
Environmental audit | Coca-Cola, Colombia | ||
Environmental audit | General Electric, Colombia |
Title | Private Sector | Notes |
Cali-Candelaria Toll Road | Yes | Approved |
Rio Bogotá Wastewater Treatment Project | Yes | Approved |
Energy Efficiency Program | Approved | |
Cartagena's Sewer System | Approved | |
Porce II Hydroelectric Power Plant | Approved | |
Medellín River Sanitation Project | Approved | |
National Land Improvement Program (PRONAT) | Approved | |
Environmental Program | Approved | |
Support of Privatization and Concessions in Infrastructure | Approved | |
Termovalle | Yes | Approved |
Transmetano Gas Pipeline | Approved | |
Gasoducto Transmetano | Yes | Approved |
Strengthening for the Water and Basic Sanitation Service Regulatory Commssion | Approved | |
Pacific Coast Sustainable Development Program | Approved | |
Wayuu Economic Development Project | Approved | |
Programa de Carreteras Departamentales | EIA | |
Programa de Desarrollo Territorial II | EIA | |
Fortalecimiento de la Gestión Educativa | Proposed | |
Formalización Propiedad y Titulación Predial | EIA | |
Apoyo Congreso República | Proposed | |
Gasoducto Transmetano | Yes | EIA |
Programa de Agua Potable y Saneamiento de Pereira | Proposed | |
Planta Termoeléctrica Termovalle | Yes | EIA |
Programa de Tecnología y Sanidad Agropecuaria | Proposed | |
Integrated Rural Development | Proposed | |
Carretera Peaje Cali-Candelaria-Florida | Yes | EIA |
Rationalization of Distribution Entities | Proposed | |
Tratamiento de Aguas Residuales para Santa Fe de Bogotá | EIA | |
Cartagena Sewerage System | EIA | |
Energía Gasoducto Termo Candelaria | Yes | Proposed |
Apoyo a la Participación Económica de la Mujer | Proposed | |
Tibitoc Water Treatment Facility | Yes | EIA |
Tibitoc Water Treatment Facility | Yes | Proposed |
Technical Training for the Paper Industry | Proposed | |
Campo Geotérmico Azufral | Proposed |
Bank | Project | Fiscal Year (Approval) | Total ($M) | Bank ($M) |
World Bank | Cartagena Water Supply, Sewage and Environmental Cleanup Project | 1997 | 115 | 35 |
Urban Environmental Management Project | 1996 | 40 | 19 | |
Colombia Natural Resource Management Program | 1994 | 65 | 39 | |
Inter-American Development Bank | Pereira Potable Water and Sanitation Project | 1993 | 130 | 78 |