Environmental Technologies Industries
|
Market Research |
ADB Environment Projects |
Cambodia |
· Rural Development -- $25 Million loan in the early stages of development, to support rural infrastructure (roads, water supply), provision of social services and institutional strengthening. Status: Fact finding completed, loan appraisal in August. Loan to be considered for approval in November 2001. Project Officer: Alain Goffeau (632-6955).
|
China, People's Republic of |
· Mudanjiang Water Supply – A $100 Million Loan to (i) alleviate the current severe raw water quality problems in Mudanjiang and Hailin and meet future water demands; (ii) improve public health by providing clean raw water; (iii) provide installed capacity of 60 megawatts (MW) of renewable hydroelectricity to the Heilongjiang provincial electricity grid for peaking power, (iv) promote long-term urban development in Mudanjiang and Hailin cities; (v) assist in institutional strengthening of the Mudanjiang Linhai General Water Supply Company (MLGWSC) for the commercial operation and maintenance of the new system; and (vi) promote tariff reforms to achieve full cost recovery. Status: Project still in the planning stage, awaiting acceptance by the Government to move forward. Project Officer: Mr. Sangay Penjor (63-2) 632-6298.
|
Cook Islands |
· Waste Management Project - $2.2 Million loan to facilitate sustainable and appropriate solid waste management practices in Rarotonga and Aitutaki. The Project includes the construction of engineered, environmentally sound landfills and a public awareness component. Status: Approved on July 17, 2001. Total project cost $3.1 million, due for completion in 2003. Project Officer: E. Gordon Fox (63-2) 632-5510. |
India |
· Gujarat Earthquake Rehabilitation and Reconstruction Project -- $500 Million loan. The scope of the Project comprises: (i) immediate rehabilitation support to fund social safety net; (ii) assistance for power sector rehabilitation; (iii) assistance for urban infrastructure rehabilitation; and (iv) assistance for the reconstruction of residential houses. Status: Approved on March 26, 2001. Currently being implemented and consultants already selected. Loan paper is available (contact our office for details). TA for Capacity Building for Earthquake Rehab. -- ($1.3 Million) is shortlisted. VA Polytechnic Institute & State University is shortlisted to submit a proposal in the end of August. Project Officer: Klaus Gerhaeusser (63-2) 632-5396.
|
Indonesia |
· Urban Poverty Reduction Sector – $800,000 Project Preparatory TA (PPTA) to assist the Government to identify and prepare a sector project for districts to establish urban poverty reduction systems and programs, in partnership with central Government, civil society and the private sector. The TA will require the services of 20 person-months of international consultants and 30 person-months of domestic consultants. Status: Approved on April 3, 2001. Project awarded to Research Triangle Institute (RTP, NC). Project Officer: Charles T. Andrews (63-2) 632-6731.
|
Kazakhstan |
· Rural Water Supply and Sanitation Sector – $40 Million loan to provide basic water supply & sanitation infrastructure services, including 100 subprojects of physical infrastructure and also consulting for institutional strengthening and project management. Implementing Agency: Ministry of Natural Resources and Environment Protection. Status: Anticipate approval in September/October 2001. Project Officer: Peter Wallum (632-6846). · Institutional Strengthening for Rural Water Supply and Sanitation Sector Services -- $650,000 Advisory TA piggybacked to the approval of the loan (above) to develop good practices and create the appropriate management systems for the smooth implementation of these services professional support to O&M services of water supply and sanitation (WSS) systems, developed under the loan. Status: Awaiting loan approval t move forward. Project Officer: Peter Wallum (63-2) -632-6846. |
Laos |
· Vientiane Urban Infrastructure and Services Project -- $37 Million loan composed of a $25 Million ADB loan, Government financing and a $4.4. Million bilateral cofinancing from the French. The project aims to support decentralization and urban governance reforms for community participatory approaches, and secondly, to target investments in infrastructure and services to maximize the utility of existing infrastructure focusing on secondary and tertiary level infrastructure including roads, drainage, solid waste, traffic management, etc. The project area covers a hundred urban villages. Implementing Agency: Vientiane Prefecture (Provincial Government). Consultancy: 76 person-months of international consultancy to assist in Project Implementation Management. Additional 65 person-months of international consultancy for capacity building. Status: Scheduled for approval by the ADB Board of Directors on August 23. Project Officer: Gulger Cezayirli (63-2) 632-6879. · Capacity Building for Environment and Social Management in Energy and Transport --$600,000 Advisory TA focused on the country strategy priority on sustainable environmental management, to include: (i) strengthening institutional capacity for policy implementation and regulatory enforcement, including social and environmental impact assessments; (ii) systematic consultations with all stakeholders on social and environmental issues, and increased transparency in environmental monitoring and assessment; (iii) support for river basin development. Status: Currently accepting EOI’s. Approval is anticipated in mid-September, with shortlisting in late September or early October. Project Officer: Eva Maria Mayerhofer (63-2) 632-6408. |
Pakistan |
· Southern Punjab Basic Urban Services --$500,000 Project Preparatory TA to design a
|
Philippines |
· Mindanao Basic Urban Services Sector Project -- $35 Million loan to upgrade and rehabilitate basic municipal infrastructure and services covering water supply, sanitation and sewerage, drainage and flood control, solid waste management, urban roads and bridges, public market and other public facilities. Status: Scheduled for ADB Board consideration and approval on September 25. Consulting Services: 130 person-months of the 644 total required will be provided under the Nordic Development Fund. Project Officer: KyeongAe Choe: (63-2) 632-6899. · Integrated Coastal Resources Management --$933,000 PPTA to promote adoption of an integrated approach for sustainable management of the coastal resources and related ecosystem, conserve coastal resources, control land-based pollution and siltation and reduce the extensive poverty in coastal areas by providing opportunities for increasing income and improving living standards of coastal communities and upland communities adjacent to the coastal areas. Status: Approved on August 2. EOIs are closed and shortlisting completed by early September. Project Officer: Weidong Zhou (63-2) 632-6938. |
Nepal |
· Optimizing Water Use in Kathmandu Valley -- $775,000 Advisory TA to assist with (i) optimal management of water within Kathmandu Valley based on an accurate knowledge of all sources and all demands; and (ii) immediate improvements to the water supply situation in Kathmandu Valley. The TA is a high Government priority, as it is needed to complement the major development of the Melamchi Water Supply Project, which has been approved and is being worked on by Metcalf & Eddy (New Jersey). Status: Approved on August 7, 2001. TA has been shortlisted. Project Officer: Arthur C. McIntosh (63-2)-632-6839. |
Sri Lanka |
AWARDED: Ø Integrating Cleaner Production into Industrial Development - $800,000 Advisory TA was awarded to International Resources Group, Ltd. (Washington, DC). August, 2001. Ø Secondary Towns Water Supply and Sanitation -- $945,000 PPTA was awarded to Coffey MPW Pty. Ltd (Manila, Philippines) in association with Ceywater Consultants Ltd. May, 2001. |
Uzbekistan |
· Urban Infrastructure Project - $40.5 Million loan to improve the living and health conditions in the regional cities of Karshi, Djizzak, and Gulistan, where there are high proportions of poor people, through the improvement of basic infrastructure services. The Project consists of three components: water supply, heating and hot water, and capacity building and project management. Status: Scheduled for ADB Board consideration and approval on September 27. Project Officer: Amy S.P. Leung: (63-2) 632-6730. |
Vietnam |
· Second Red River Water Resources Sector Project -- $70 Million loan to improve agricultural performance of poorer communities through sustainable improvements in irrigation, better drainage, watershed protection and flood protection, within a framework of integrated water resource management in the Red River basin. Part A includes (a) capacity building for the Red River Basin Organization, (b) public awareness and education programs, (c) pilot water licensing systems, (d) water quality monitoring network, and (e) project management support. Status: Scheduled for ADB Board consideration and approval on September 20. Advance Action for recruitment of consultants was approved on June 5, allowing consultants shortlists and processing prior to official loan approval. Project Officer: Wouter T. Lincklaen Arriens (63-2) 632-6754.
|
NEW “PROPOSED” ENVIRONMENT PROJECTS |
US-AEPCountryProject NameProject Type/ No.Executing AgencyAmount ($ '000)StatusADB Project Officer |
AzerbaijanBasic Infrastructure Development in Secondary TownsPPTA/35087-01 State Committee on Architecture and Construction, House of Government740.0Fact-Finding in Field: 12 Jul 2001 Lyaziza G. Sabyrova (63-2) 632-6739 |
LaosNorthern Community-Managed Irrigation SectorPPTA/34188-01Department of Irrigation700Fact-Finding in Field: 11 Jun 2001 Toshio Kondo (63-2) 632-6779 |
MaldivesRegional Development Project Phase IIPPTA/ 33218-01Ministry of Finance and Treasury600 Fact-finding Mission: Jul 2001.Nayana Mawilmada (63-2) 632-6483 |
XThailandNorth-Northeast Region Area DevelopmentPPTA/33328-01National Economic and Social Development Board1,000 Fact-finding Mission: Nov 2001.Graham S. Jackson(63-2) 632-5939 |
XViet NamCentral Region Urban Development and Housing FinancePPTA/34355-01 Ministry of Construction900Beginning of Fact-finding Mission: Aug 2001.Alfredo Perdiguero (63-2) 632-6828 |
XIndiaMadhya Pradesh Integrated Water Resource Management StrategyAOTA/35045-01Water Resource Department500Fact-Finding Mission Completed: 11 May 2001Kenichi Yokohama (63-2) 632-6937 |
XIndonesiaRegulatory Framework for the Water SectorAOTA/35142-01Directorate General of Urban and Rural Development500Beginning of Fact-Finding Mission: Sep 2001Karen Decker (63-2) 632-6767 |
LaosCapacity Building for Social and Environmental Management in Transport and EnergyAOTA/35010-01Science Technology and Environment Agency 600Beginning of Fact-Finding Mission: Jun 2001Naseem Ahmad (63-2) 632-6789 |
PakistanImplementation of National Environment StrategyAOTA/35056-01Ministry of Environment, Local Government and Rural Development300Fact-Finding Mission Completed: 24 Apr 2001Ali Azimi (63-2) 632-6819 |
AsiaClean Air Initiative for Asian CitiesRETA/35272-01Asian Development Bank150Submission for Pres.s Consideration: Jul 2001.Charles M. Melhuish (63-2) 632-6803 |
US-AEPCountryProject NameProject Type/ No.Executing AgencyAmount (US$ Million)StatusADB Project Officer |
XViet NamSecond Red River Water Resources (Sector)LOAN/ 330292-01Ministry of Agriculture and Rural Development70Appraisal completed 15 Jun 2001 W.T. Arriens (63-2) 632-6754 |
LOAN/ 33443-01Ministry of Agriculture35.0Appraisal Completed: 16 Jun 2001Yee Yuen Loh (63-2) 632-6952 |
Cambodia
Fact-Finding in Field: 2 Jul 2001Alain Goffeau (6-32) 632-6955 |
“APPROVED” PROJECTS |
LOANS |
US-AEPCountryProject NameProject No.Amount (US$ Million)Approval Date |
ChinaTianjin Wastewater Treatment and Water Resources ProtectionLOAN/179713012/11/00 |
xIndiaCalcutta Environmental ImprovementLOAN/181325012/19/00 |
xIndonesiaMarine and Coastal Resources ManagementLOAN/17705010/26/00 |
Nepal Melamchi Water Supply LOAN/182012012/21/00 |
PNGProvincial Towns Water Supply and SanitationLOAN/181215.312/14/00 |
TECHNICAL ASSISTANCE |
US-AEPCountryProject NameProject No.Amount (US$ '000)Approval Date |
ChinaHarbin Water SupplyPPTA/357172012/12/00 |
ChinaTA Cluster for Transjurisdiction Environmental ManagementAOTA/35882,20012/11/00 |
XEast TimorEnvironmental Assessment Capacity ImprovementAOTA/3501250 |
KazakhstanRural Water Supply SectorPPTA/357260012/12/00 |
LaosNam Ngum River Basin DevelopmentPPTA/354485011/14/00 |
LaosStrengthening the Social and Environmental Management in the Road SectorAOTA/355720012/07/00 |
PNGCommunity Water Transport ProjectPPTA/361558012/21/00 |
XSri LankaSecondary Towns Water Supply and SanitationPPTA/35871,00012/15/00 |
TajikistanCapacity Building for Environmental Assessment and Monitoring AOTA/361460012/21/00 |
XThailandSolid Waste Management SectorPPTA/357015012/14/00 |
XThailandCapacity Building for Regional Environmental Management AOTA/356190012/08/00 |
XThailandMae Moh Environmental EvaluationAOTA/358350012/14/00 |
XVietnamCapacity Building for Water Resources ManagementAOTA/35283,80010/30/00 |
XAsiaRegional Environmental Action Plan in Central AsiaRETA/593450007/19/00 |
ADB PROCUREMENT NOTICES (July/August) |
CountryLoan #Project TitleItems to be ProcuredBid DeadlineExecuting Agency |
--5.6 km trunk sewers 300 through 600 mm --7.7 km collector sewers 200 and 250 mm --43.0 km lateral sewers 150 through 200mm --3,300 service connections --operation and maintenance office and storage facilities,.Invitation issued by December, 2001 |
- Package No. 2: Regulator-Detecting LaboratorySep. 17, 2001China International Tendering Company Fax No. 8610-6831-6696 Tel No. 8610-6840-4404 |
Wastewater Treatment Project 1. The Complete Equipment 1 set of Aquazar V Filter 2. DN100-DN300 Ductile Iron Pipes 3. DN400-DN1000 Ductile Iron Pipes 4. DN100-DN1000 Ductile Iron Pipes 5. Cement & SteelOct. 15, 2001China National Industrial Machinery Import and Export Company Fax No. 68991200 Tel. No. 68991220, Contact Person: Ms. Li Xin or Mr. Zeng Yaode |
India1704Karnataka Urban Development and Coastal Environmental Management Project - Water Supply and Distribution Schemes: - Sewerage and sewage treatment schemes - Effluent outfalls - Sewage and sludge treatment works, including both new works and upgrading existing works- Sewage pumping stations and pumping mains, about 50 nos. - Sewers, about 340 kms.Sept. 15, 2001Karnataka Urban Infrastructure Development & Finance Corp. Ltd. Tel: (0091) (080) 2232021 Fax: (0091) 080) 2232157 |